
The main bay just needs to be primed and painted and the floor finished.

Well, the studio is pretty much ready to go with a very few minor things left. I primed/painted/stained all of the finishing.
I learned a whole lot about epoxy flooring. That stuff is crazy. Whatever you do, don't mix all of it at once. Wow, that stuff was melting the bucket, steaming, smoking, hot to the touch, holy crap, I was freaking out. Long story, and some extra $$$ later, I got it done. I'm now an expert on applying epoxy. ;)
I'm thinking the next post you'll see on this will have actual printing studio stuff inside. Then the "Studio Moving Sale" will proceed. Sweet!